12/14/2023 0 Comments Milton township street parking![]() Phase 1 Common Open Space place approved by DRC on Phase 1 Construction Plans (for infrastructure) and Final Plat approved by PC on Master Plan AMENDMENT recommended by PC on , approved by BMA on Phase 1 Construction Plans (for infrastructure) approved by PC on Mixed Use PD/Master Plan recommended by PC on, approved by BMA on No specific end users or building plans are proposed at this time.Ī 2021 Amendment revised the plan to add 60 senior housing lofts (age-restricted), replace an office complex with 39 fee-simple ownership townhomes, and replace flex warehouse space with 25 detached single-family homes. The PD incorporates a mixture of retail, office, hospitality (hotel), amenities, and residential uses. ![]() Location : South side of Milton Wilson, east of the Shops of Arlington Village PD and Hall CreekĮngineer/Designer: Dalhoff Thomas Design StudioĪ PD Master Plan for a mixed-use professional development on 45 acres on the south side of Milton Wilson Blvd.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |